Hematite drill
From Cantr II Wiki
| |||||||||||||||||||||||||
Produces hematite at five times the speed of an unequipped person and two and a half times the speed of a pickaxe user.
[edit]
Projects
Maximum workers: 2
[edit]
Drilling for hematite
Output per day of labour
- 3750 grams of hematite
Maximum output
- 300000
Required resources
- none
Required tools
- none
Skill used
[edit]
Drilling for hematite (petrol)
Output per day of labour
- 5000 grams of hematite
Maximum output
- 400000
Required resources
- none
Required tools
- 50 grams of petrol
Skill used
